Extra traffic lights being installed at hectic Courtenay intersection

New traffic signals are being installed on Lerwick Road at Malahat Drive, improving safety for vehicles, cyclists and pedestrians.

New traffic signals are being installed on Lerwick Road at Malahat Drive, improving safety for vehicles, cyclists and pedestrians at this east Courtenay intersection.

The signals will be activated in late July.

Lesley Hatch, municipal engineer for the City of Courtenay, said the improvements will address changing traffic patterns and volumes, as well as follow up on a consultant’s recommendations for this intersection.

“These changes were recommended as part of a traffic impact assessment that was done for the East Courtenay Thrifty Foods development application,” advised Hatch.

The improvements will include full traffic controls and signals. Pedestrians will have access to audible crossing signals, countdown display timers, and accessible push buttons. For cyclists, bicycle markings will show the best location to activate the traffic signals.

Other intersection improvements will include a sound-activated sensor to control the signals when emergency vehicles approach, and a battery back-up allowing the traffic signals to continue operating for a limited time during power outages.

During construction, the impact on vehicle traffic is expected to be minimal. Crews will be on-site from 7 a.m. to 5 p.m. Monday to Saturday. When work on the roadway is required, traffic control personnel will be on hand to assist all road users, including cyclists.

Pedestrian access will be affected during construction, with sidewalks closed on the south side of Malahat Drive. Pedestrians will be redirected to the north side.

While some advance preparations began in mid-June, most of the work will start after the last day of school on June 27 to minimize the impact on commuters.

The new traffic signals will replace the existing overhead pedestrian crossing beacons installed in 2007.

For more information, contact the City of Courtenay engineering division at 250-334-4441 or e-mail engineering@courtenay.ca.

— City of Courtenay

 

 

Just Posted

Comox Valley Monarch Lions help ‘SPOT’ possible student vision problems

When Helen Keller challenged Lions Clubs International in 1925 to become “Knights… Continue reading

Vancouver Island brewery re-brands again after cryptic new logo failed

Victoria-based brewers said goodbye to confusing hexagon logo

North Island College Foundation helps more students than ever in the Comox Valley

More than 170 North Island College students in the Comox Valley received… Continue reading

Courtenay mom warns of candy-luring incident near Willemar Road

A Courtenay mother is speaking out after a man was reported to… Continue reading

VIDEO: Marvel Comics’ Stan Lee dies

Marvel co-creator was well-known for making cameo appearances in superhero movies

Vancouver Island remembers

Important stories shared as Islanders salute those who made the greatest sacrifice

Surging Rangers beat visiting Canucks 2-1

Goalie Lundqvist ties Plante on all-time wins list

VIDEO: Newcomer kids see first Canadian snowfall

Children arrived in Canada with their mother and two siblings last week from Eritrea

Calgary 2026 leader expects close vote in Winter Games plebiscite

Residents to choose in a non-binding vote on Tuesday whether they want city to bid on 2026 Olympics

Feds dropped ball with WWI anniversary tributes: historians

Wrote one historian: ‘Other than the Vimy Ridge celebration … I think they have done a very bad job’

Sides ‘far apart’ in Canada Post talks despite mediation, says union

The lack of a breakthrough means rotating strikes will resume Tuesday

Feds’ appeal of solitary confinement decision in B.C. to be heard

Judge ruled in January that indefinite such confinement is unconstitutional, causes permanent harm

B.C. health care payroll tax approved, takes effect Jan. 1

Employers calculating cost, including property taxes increases

Most Read