Extra traffic lights being installed at hectic Courtenay intersection

New traffic signals are being installed on Lerwick Road at Malahat Drive, improving safety for vehicles, cyclists and pedestrians.

New traffic signals are being installed on Lerwick Road at Malahat Drive, improving safety for vehicles, cyclists and pedestrians at this east Courtenay intersection.

The signals will be activated in late July.

Lesley Hatch, municipal engineer for the City of Courtenay, said the improvements will address changing traffic patterns and volumes, as well as follow up on a consultant’s recommendations for this intersection.

“These changes were recommended as part of a traffic impact assessment that was done for the East Courtenay Thrifty Foods development application,” advised Hatch.

The improvements will include full traffic controls and signals. Pedestrians will have access to audible crossing signals, countdown display timers, and accessible push buttons. For cyclists, bicycle markings will show the best location to activate the traffic signals.

Other intersection improvements will include a sound-activated sensor to control the signals when emergency vehicles approach, and a battery back-up allowing the traffic signals to continue operating for a limited time during power outages.

During construction, the impact on vehicle traffic is expected to be minimal. Crews will be on-site from 7 a.m. to 5 p.m. Monday to Saturday. When work on the roadway is required, traffic control personnel will be on hand to assist all road users, including cyclists.

Pedestrian access will be affected during construction, with sidewalks closed on the south side of Malahat Drive. Pedestrians will be redirected to the north side.

While some advance preparations began in mid-June, most of the work will start after the last day of school on June 27 to minimize the impact on commuters.

The new traffic signals will replace the existing overhead pedestrian crossing beacons installed in 2007.

For more information, contact the City of Courtenay engineering division at 250-334-4441 or e-mail engineering@courtenay.ca.

— City of Courtenay

 

 

Just Posted

Stolen Victoria vehicle crashes in Black Creek

On Sept. 15, 2018 at approximately 10:45 p.m., the Comox Valley RCMP… Continue reading

Valley Father-daughter duo share a special bond over a kidney

Annual kidney walk is set for Sept. 23 at Simms Park

Courtenay getting a tool library

New facility allows do-it-yourselfers to borrow tools

Pacific white-sided dolphins spotted near Little River Ferry Terminal

A pod of Pacific white-sided dolphins spent the evening of Sept. 13… Continue reading

Comox Valley Men’s Group meets Mondays

Where can men go when they are seeking a non-judgmental forum to… Continue reading

B.C. RCMP turn to Const. Scarecrow to shock speeders into slowing down

New addition will watch over drivers from a Coquitlam median for first-of-its-kind pilot in Canada

B.C. home to 1/3 of Canada’s overdose deaths in first 3 months of the year

There were 1,036 overdose deaths in the first three months of the year, with 94 per cent accidental

B.C. candidate moves from hospice care to council race

He beat terminal cancer twice and entered hospice when he decided to run for council.

Seminal British band performs in Courtenay

Wishbone Ash is approaching its 50th year of existence

Ministry of Agriculture commits $300,000 to help B.C. farmers obtain land

B.C. Land Matching Program supports access to affordable farmland for young farmers

Canadian air force short 275 pilots

Attrition outpaces recruitment and training claims Air Force

Teacher suspended after physically shushing, saying ‘shut up’ to student

Grade 5 student reported feeling ‘confused and a little scared’

A B.C. society helps to reforest Crown land after wildfires

Forest Enhancement Society of BC focuses on wildfire mitigation and the reforestation

Most Read